Page 43 - Lee Point - Design Guidelines
P. 43

Key Information for for Builders and Ca •
1 x P25 Conduit (builder to supply)
DESIGN GUIDELINES
41
Internal Wall Cavity
PSU
(Power Supply Unit)
NTD
(Network Termination Device)
FWO
(Fibre Wall Outlet)
PSU
(Power Supply Unit)
Internal Wall Cavity
PCD
(Premises Connection Device)
FGL
Internal Wall Cavity
PCD
(Premises Connection Device)
FGL
NBN
CO TO SUPPLY:
•
All the fibre optic cab NBN
Equipment NBN
CO TO BUILDER/CA TO SUPPLY:
•
Use a a a P25 telecomm KEY INFORMATION FOR FOR BUILDERS AND CABLERS BUILDER/CABLER TO SUPPLY:
ALL CONDUIT FITTINGS MUST BE GLUED ORANGE CONDUIT MUST NOT BE USED Floor Slab
GPO
1 x P25 Conduit (builder to supply)
ROOM/ internal Diameter) c c 1 Use Rigid White P25 Telec FGL
premises using con 2 Use no more than 3
x 90o •
T Ph e e e e e e e e r r r o o o o o o b
b
b
v e e e e e e e e n n n n n i i i d d d d d d d d d d e e e e e e e e r r r a a a a L d d d d d e e e e e e e e i i i u a a a a s s d d d d d o o o o o o f i i i e e e e e e e e n n n n n a a a a c C h h h o o o o o o b
b
b
n n n n n e e e e e e e e 300mm or or or more Notes
FGL
•
The service drop cab (GPO) for the install premises using cond
••PUrosveidaePL2e5adteilnecCoomnm Notes
1 Use Rigid White P25FlToeolercoSmlamb unications Conduit ONLY 2 Use no more than 3
x 90o bends between draw points NBN
CO TO GARAGE
•
•
•
•
•
The internal fibre opti to the Fibre Wall Outl •
The NTD
•
The PSU
•
The service drop cable to the PCD
location
The PCD
The internal fibre optic cable from PCD
to the Fibre Wall Outlet (FWO)
The NTD
The PSU
All the fibre optic cables
•
The service drop ca •
The PCD
•
The internal fibre op to the Fibre Wall Ou •
The NTD
•
The PSU
•
All the fibre optic ca w w w w FWO
(Fibre Wall Outlet)
Floor Slab
TV 1 Use Rigid White P25 Tele •
•
•
•
•
PHONE POINT DATA POINT POWER POINT KITCHEN
LAUNDRY
Use a a P25 telecommunications conduit (23mm Internal Diameter) in in in the trench Glue all joints using solvent cement Ensure the conduit runs as as straight as as possible Install a a a drawstring in in the conduit Fix all P25 telecommunications conduit (23mm internal Diameter) conduits securely to the premises using conduit saddles or similar
Provide Lead in in Conduit (LIC) and power point (GPO) for the the installation of the the NTD
1 x P25 Conduit (builder to supply)
1 x P25 Conduit (builder to supply)
using solvent cement •
Ensure the conduit ru •
Install a a a drawstring in in Internal Conduit PCD
Key Inf ALL CONDUIT FITTINGS MUST BE GLUED ORANGE CONDUIT MUST NOT BE USED GPO
300mm radius bends (GInPteOrn) afolrDtihaeminestetar)lliant using solvent ceme •
Ensure the conduit r r •
Install a a a drawstring i i •
Fix all P25 telecom The bend bend radius of each bend bend must be be be no less than 300mm or or more 2 Use no more than 3
x 90o •
TThhe PbeCnDd radius of each NTD
Floor Slab
(Network Termination Device)
tion for Builders a a orma nd nd Ca 3
00m mr
adius be nds Inte rna l Diam eter ) in t Internal Wall Cavity
BUILDER/C •
Fix all P25 telecomm internal Diameter) co TO SUPPLY:
Notes
300mm or or more 
   40   41   42   43   44